Preparing Pavers for Walkway

Orangeville, ON (James Doan) Placed the initial base for the rubber cobble stone bed.

Will probably need an additional 12 to 15 bags of soil to raise to the correct level to install barrier. 

Categories: Tags:

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s